Name + Type | Region
State the business/safety outcome in 1–2 sentences. Focus on risk eliminated or downtime saved.
Key Specs at a Glance
Industry:
e.g., Mining / Transportation / Infrastructure
Services:
e.g., Rockfall Mitigation, Slope Stabilization
Location:
e.g., Northern Canada (Sub-Arctic)
Key Metric:
e.g., Vertical 90° Mine Face / -40°C Operating Window
Timeline:
e.g., Start date/Completion date
At a Glance & Project Overview
The Stakes
(What was at Risk?): Briefly define the asset, operational downtime, or safety threat. Commercial decision-makers need to see that you understand operational risk.
Why GRW Was Engaged
3–4 bullet points highlighting your specific differentiators (e.g., twin-rope access, extreme climate equipment adaptations, emergency mobilization).
Key Challenges
Operating Conditions
Extreme cold, vertical terrain, weather windows.
Logistics & Access
Remote heli/tracked access, high-angle rope rigging.
Equipment Reliability
Freezing risks, custom mechanical modifications.
Technical Approach & Methodologies
Site Assessment & Hazard Planning
- Initial Evaluation
ex. Assessed slope geometry, schist failure mechanisms, and terrain risks in collaboration with facility project managers to design a custom remediation and safety plan.
Read More
Initial Evaluation
High-Angle Preparation
Check & Access
- High-Angle Preparation
ex. Rigged twin-rope access systems and performed systematic check scaling on vertical rock faces to clear loose overburden and prepare stable anchor zones.
Read More
Mechanical Adaptation
Primary Stabilization
Installation
- Primary Stabilization
ex: Deployed Bencher and Marini Down-The-Hole (DTH) drill equipment on rope systems to drill rock anchors and secure bolted mesh barriers 60m above the pit floor.
Read More
Equipment Used
Drilling Gear
Marini Down-The-Hole (DTH) drill, Bencher drill systems.
Support Machinery
Modified diesel air compressors, pneumatic drill platforms.
Access & Safety
Twin-rope access systems, specialized cold-weather PPE, custom high-angle rescue equipment.
Measurable Outcomes & Value Delivered
Operational Impact
Resumed full production, zero asset loss, high-wall risk mitigated.
Client & Public Value
Safe working environment for on-site personnel, long-term slope integrity.
Facing a similar project hurdle?
If you are facing a complex high-wall failure or difficult-access slope issue, contact GRW's Technical Response Team today!