Tank Hill: Rockfall Protection | British Columbia

Global Rock Works installed engineered rockfall protection above Highway 1 and the CPKC railway near Lytton, B.C., supporting reconstruction of a critical transportation corridor following the November 2021 atmospheric river.

Key Specs at a Glance

Transportation / Highways & Railways
Rockfall Mitigation / Rock Bolt Installation / Rope Access
Tank Hill, near Lytton, British Columbia
Three attenuator sections / Approximately 233 m / 40 rock bolts
November 2021

At a Glance & Project Overview

The Stakes

The November 2021 atmospheric river severely damaged highway and railway infrastructure at Tank Hill. Reconstruction required rockfall protection above Highway 1 and the CPKC railway, a vital corridor supporting communities, regional travel and freight movement through British Columbia’s Fraser Canyon.

Why GRW Was Engaged

Specialized rockfall mitigation expertise for slopes above highway and railway infrastructure. Rope-access capabilities to reach steep, difficult-access installation areas.Drilling and installation capabilities for rock bolts and engineered attenuator systems. Ability to coordinate complex installations with the prime contractor and project engineers.

Operating Conditions

Steep slopes above a confined highway and railway corridor, with rockfall exposure affecting infrastructure and construction work areas.

Logistics & Access

Limited access for drilling, lifting and material handling required rope access and crane-assisted material placement.

Equipment Reliability

Anchoring, support-post installation and net placement were sequenced with the prime contractor and project engineers.

Technical Approach & Methodologies

Initial Evaluation

Coordinated access, material placement and installation sequencing with Ledcor’s team and the project engineers, accounting for the steep terrain and shared transportation corridor.

High-Angle Preparation

Used rope access to reach steep work areas and removed existing mesh as part of the rockfall mitigation scope.

Mechanical Adaptation

Installed 40 rock bolts and support posts up to seven metres high to support the engineered attenuator systems.

Primary Stabilization

Installed three Geobrugg attenuator sections totalling approximately 233 metres, with mesh drapes extending up to 60 metres downslope to guide falling rock toward designated collection areas.

Equipment used

Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Drilling Gear
Specialized drilling equipment and rope-access systems for installation on steep slopes.
Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Support Machinery
Crane-assisted placement of support posts and large net panels across difficult terrain.
Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Access & Safety
Geobrugg GBE-3000 components, SPIDER® S4/130 spiral rope nets and TECCO® G65/3 steel wire mesh

Measurable Outcomes & Value Delivered

Installed three rockfall attenuator sections spanning approximately 233 metres and 40 rock bolts, contributing to engineered rockfall protection above Highway 1 and the CPKC railway.
The installations supported the reconstruction and resilience of a transportation corridor important to public travel, railway operations and the movement of goods between Canada’s Pacific gateways and inland markets.
Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Tank Hill: Rockfall Protection for a Critical Transportation Corridor
Tank Hill: Rockfall Protection for a Critical Transportation Corridor

Facing a similar project hurdle?

If you are facing a complex project such as high-wall failure difficult-access slope issue, or something similar to this project, contact GRW’s Technical Response Team today!

Receive a Free Estimate Below

Name(Required)