Stabilizing the Abbot Hut
When Canada’s highest permanent structure was at risk of collapsing, we provided slope stabilization to secure this historic, heli-access-only public recreation site.
Remediating a Remote Open Mine in the Arctic
Our team operated in minus 40°C temperatures to stabilize a schist wall at an active open mine site.
Installing a Critical Remote Canyon Debris Barrier
We installed a Trumer debris net to protect the residential and commercial population from catastrophic river debris flow.
Facilitating the Passage of At-Risk Fish Species
A massive landslide obstructed the migratory path of several wild salmon species, putting them at risk of extinction and causing significant economic impacts.
California Route 36 Emergency Landslide Repair
After a landslide sent debris across both lanes of Highway 36, GRW provided emergency hazard mitigation and drapery installation to restore swift access to the roadway.